Calidad y Seguridad

  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Declaration of views_plugin_display::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/plugins/views_plugin_display.inc on line 1877.
  • strict warning: Declaration of views_plugin_display_page::options_submit() should be compatible with views_plugin_display::options_submit(&$form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/plugins/views_plugin_display_page.inc on line 481.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_argument.inc on line 745.
  • strict warning: Declaration of views_handler_argument_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_argument.inc on line 770.
  • strict warning: Declaration of views_handler_sort_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_sort.inc on line 82.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_filter.inc on line 585.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_filter.inc on line 585.
  • strict warning: Declaration of views_handler_filter_broken::ui_name() should be compatible with views_handler::ui_name($short = false) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_filter.inc on line 609.
  • strict warning: Declaration of views_handler_filter_node_status::operator_form() should be compatible with views_handler_filter::operator_form(&$form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/modules/node/views_handler_filter_node_status.inc on line 14.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /var/www/clients/client268/web294/web/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 128.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • : Function split() is deprecated in /var/www/clients/client268/web294/web/sites/all/modules/menu_block/menu_block.module on line 137.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.
  • strict warning: Non-static method view::load() should not be called statically in /var/www/clients/client268/web294/web/sites/all/modules/views/views.module on line 843.

PROCONTROL dispone de todos los referentes de calidad y seguridad que se puedan requerir,  necesarios en los proyectos más exigentes:

Documentación general:

  • Procedimientos de trabajo
  • IAE/ Alta Fiscal
  • TC1, TC2/TA2 Altas
  • Seguro Responsabilidad Civil y último recibo
  • Certificados de hallarse al corriente de pago con la Seguridad Social
  • Plan de Seguridad y Salud (PSS), o adhesión al PSS del contratista principal
  • Evaluación de riesgos  para los trabajos a realizar, o , adhesión al PSS del contratista principal.
  • Programa vigilancia ambiental/ Plan medioambiental o adhesión.
  • Seguro de Responsabilidad Civil y Patronal de la empresa contratista  con su pago actualizado.
  • Contrato con Mutua de Accidentes de Trabajo y Modalidad del Servicio de Prevención contratado.
  • Nombramiento del Responsable de Seguridad y Salud en obra junto a copia su formación específica.
  • Nombramiento del responsable de Medioambiente.
  • Realización del libro de subcontratación sellado por la autoridad laboral(contratistas). Firma del libro de subcontratación (subcontratistas y trabajadores autónomos)
  • Relación de personal con DNI y oficio.
  • Descripción de los trabajos a realizar.
  • Certificado de inscripción en el Registro de Empresas Instaladoras de Electricidad para la realización de actividades de Baja Tensión con Categoría Especialista (REIE).
  • Historial de siniestralidad (5 últimos años)
  • Nombramiento  responsable de la obra.
  • Nombramiento responsable de Calidad
  • Certificado de inscripción en el Registro de Empresas Acreditadas del sector (REA).
  • Copia de la Evaluación de Riesgos de la empresa.
  • Acta de adhesión de empresas subcontratistas y autónomos al PSS.

Documentación de trabajadores:

  • Relación de trabajadores asignados a la obra y actividad detallada que van a realizar.
  • Alta en la Seguridad Social (nuevos trabajadores).
  • Formación en PRL:
    • Certificado de formación.
    • Certificado de Información del Plan de Seguridad.
    • Entrega de EPIs.
  • Apto médico.
  • Acreditación de uso y mantenimiento de maquinaria.

Documentación de maquinaria y vehículos:

  • Relación especifica de la maquinaria y vehículos a utilizar.
  • Permiso de circulación
  • Ficha técnica  e ITV en vigor
  • Libro de revisiones periódicas
  • Manual de instrucciones
  • Marcado CE (solo subcontratistas y autónomos).
  • Último recibo de pago del seguro

Todos nuestros suministros superan los tests y pruebas según  reglamentación vigente. En el caso de armarios eléctricos, se extiende el correspondiente marcado CE (cumpliendo las directivas de baja tensión, electromagnética y seguridad de máquinas); se realizan los ensayos de seguridad de los armarios que básicamente son: rigidez dieléctrica, resistencia aislamiento y continuidad   y, se realiza un ensayo  de aceptación global, en nuestro talleres, o lo que es más conocido como FAT (Factory Acceptance Test).

Una vez en el emplazamiento del cliente, se realizan los ensayos de aceptación correspondientes, más conocidas como las pruebas SAT (Site Acceptance Test) y si fuera necesario, según el alcance de los suministros y según los requerimientos del cliente (industria farmacéutica), se realizan las correspondientes validaciones IQ (Installation Qualification) y OQ (Operational Qualification), previo a disponer de unas Especificaciones Funcionales del sistema y de un protocolo DQ (Design Qualification) por parte del cliente.